Flow chart  

1.  Estimate order
2.  Sign contract
3.  Estimate technical specification (client confirmation)
4.  Confirmthe project (QC Dept. follow the project)
5.  CAE stucture caculation/dynamic fluid caculation/thermodynamic caculation
       (optimising moulding and cost)
6.  CAD preliminnary study,finish project assembly drawing.
7.   Work out 3D mould project according to the customer and Tianyi standard.
8.   Send 3D drawing for customer modification and cinfirmation.
9.   Main material Purchasing
10. Mould base and standard components purchasing
11. Machining begin and send to the customer the tooling & proessing schedule.
12. Update the tooling & processing schedule weekly,report to customer by photos.
13. Machining procedure checking
14. Parting and die spotting
15. Mould 1st testing (2nd testing if necessary ) check the product dimension and take
      down the mould testing report.
16. Sending the testing sample to customer for inprovements or confirmation.
17. Delivery the qualified mould (including mould operation instruction, 2D project
       drawing,spare part list,and mould quality certificate etc.)
18. Filed customers opinion and related information.

 